广州翻译公司
 
   
首 页 | 关于我们 | 服务价格 | 质量保证 | 翻译样本 | 客户名录 | 在线词典 | 翻译资源 | 联系我们
    当前位置:首 页翻译样本 电器_中译英  
 

机械 中英

机组安装
Units Installation
安装须知
Installation Instructions
在需要安装或移动空调器时,应请专业空调安装维修人士操作;非专业人士的操作会给您造成损失,制造厂家不承担任何责任。
Please refer the installation or moving of air conditioner to professional personnel as needed; any operation made by non-professional personnel may cause losses; we will assume no responsibility for any consequence caused accordingly.
? 用户应提供满足安装和使用要求的电源。电压范围:单相交流电源198~242V 50Hz;三相交流电源342~418V 50Hz。超出此范围将影响空调器正常工作甚至损坏空调器。所以在必要时,请使用稳压设备,以免造成您的损失。
The user shall provide a power supply that meets installation and operation requirements as follows: single-phase AC power supply: 198~242V 50Hz of; 3-phase AC power supply: 342~418V 50Hz. It may affect the normal operation of and even cause damage to the air conditioner if the voltage of power supply used is out of the said range. Please use voltage stabilizing device as necessary to avoid losses.
空调器必须可靠接地,否则可能引起触电或火灾。www.en-ch.com
The air conditioner must be earthed reliably otherwise it may result in electric shock or fire hazard.
空调器必须设置独立线路,独立线路中必须安装相应规格的漏电保护装置。
Independent circuit must be set for the air conditioner, and leakage protection device with corresponding specification must be installed in the independent circuit.
在空调器未安装完毕和仔细检查之前,请不要接通空调器的电源。
Never switch on the air conditioner without completing installation and carrying out careful check in advance.
风管设计和安装必须符合国家暖通空调管道设计规范。
The air duct must be designed and installed in accordance with national design code for HVAC duct.
电线、排水管和管路需正确连接,若连接不正确可能引起空调器不工作、工作一段时间后效果变差、漏水、制冷剂泄漏、触电甚至发生火灾。
Power wire, drainage pipe and duct shall be connected correctly otherwise it may result in operating failure of air conditioner, or impaired effect, water leakage, refrigerant leakage, electric shock or even fire hazard after a period of operation.

制冷剂连接管
Connecting Pipe of Refrigerant
接管尺寸见性能参数一览表。
See the List of Performance Parameters for the size of connecting pipe.
如在空气中敞开15秒以上,应抽真空。一般地,如果没有准备好连接室内、外机组的配管,请勿拆卸部件(阀门、接头、橡胶、塑料圈及铜帽等元件)。
It shall be vacuumed if the connecting pipe is exposed to the air for over 15s. Generally, do not remove components (including valve, connector, rubber, plastic ring and copper cap) before the tubing for connecting indoor, outdoor units are prepared.



 
 
--------------------------------------------------------------------------------------------------------------------------
版权所有 @ 贯日翻译服务有限公司(广州|北京|上海|深圳|东莞)|网站地图
广州市越秀区环市东路371号世贸南塔24楼
全国免费服务电话: 400 888 0389
广州 020-86266990 手机15711834984 电子邮件:chi@en-ch.com
网站备案登记号:粤ICP备15089450号